A model for integrating process planning and production planning and control in machining processes

  • Authors:
  • J. Ciurana;M. L. Garcia-Romeu;I. Ferrer;M. Casadesús

  • Affiliations:
  • Department of Mechanical Engineering and Industrial Construction, University of Girona, Av. Lluís Santaló s/n, 17071 Girona, Spain;Department of Mechanical Engineering and Industrial Construction, University of Girona, Av. Lluís Santaló s/n, 17071 Girona, Spain;Department of Business Administration, Management and Product Design, University of Girona, Av. Lluís Santaló s/n, 17071 Girona, Spain;Department of Business Administration, Management and Product Design, University of Girona, Av. Lluís Santaló s/n, 17071 Girona, Spain

  • Venue:
  • Robotics and Computer-Integrated Manufacturing
  • Year:
  • 2008

Quantified Score

Hi-index 0.00

Visualization

Abstract

The goal of process planning is to propose the routing of a previously designed part and results in a sequence of operations and their parameters. It concerns and requires detailed information about the process. The goal of production planning, on the other hand, is to schedule, sequence and launch the orders introduced on the routing sheet into the job-shop according to the enterprise's strategic goal and the actual conditions of the production plant. The goals, information and decisions taken in process planning and production planning and control are often very different and, because of that, it is very difficult to integrate them. The objective of this work is to develop a model that can be applied in the future to the development of an integrated process planning and scheduling tool using an integrated definition (IDEF) methodology to design an activity model, which integrates process and production planning in metal removal processes. An activity model will be used to develop a system that allows the user to plan the process and the production at the same time in collaborative engineering work. To design the activity model, a wide range of parts were evaluated and processed in an actual job-shop factory. Several activities were developed in detail to be tested in real cases, and an example of one of them is introduced in this article.