Team-work based architecture for distributed manufacturing scheduling

  • Authors:
  • Ana Madureira;Nuno Gomes;Joaquim Santos

  • Affiliations:
  • Computer Science Department, Institute of Engineering, Polytechnic of Porto, GECAD, Knowledge Engineering and Decision Support Research Group, Porto, Portugal;Computer Science Department, Institute of Engineering, Polytechnic of Porto, GECAD, Knowledge Engineering and Decision Support Research Group, Porto, Portugal;Computer Science Department, Institute of Engineering - Polytechnic of Porto, GECAD, Knowledge Engineering and Decision Support Research Group, Porto, Portugal

  • Venue:
  • SMO'06 Proceedings of the 6th WSEAS International Conference on Simulation, Modelling and Optimization
  • Year:
  • 2006

Quantified Score

Hi-index 0.00

Visualization

Abstract

This paper presents a Team-Work based architecture for Distributed Manufacturing Scheduling with Genetic Algorithms and Tabu Search. We consider that a good global solution for a scheduling problem may emerge from a community of machine agents solving locally their schedules and cooperating with other machine agents. Social aspects are considered when a community of autonomous agents cooperate to reach a common goal. Agents negotiate in a cooperative way, in order to find a consistent overall plan, while avoiding significant changes onto their current best possible local plans. A cooperative negotiation mechanism is proposed.