Measuring reuse of SAP requirements: a model-based approach
SSR '99 Proceedings of the 1999 symposium on Software reusability
Bayesian Analysis of Empirical Software Engineering Cost Models
IEEE Transactions on Software Engineering
Software Cost Estimation with Cocomo II with Cdrom
Software Cost Estimation with Cocomo II with Cdrom
Portfolio Management Method for Deadline Planning
METRICS '03 Proceedings of the 9th International Symposium on Software Metrics
Portfolio management of software development projects using COCOMO II
Proceedings of the 28th international conference on Software engineering
Approaching the ERP Project Cost Estimation Problem: an Experiment
ESEM '07 Proceedings of the First International Symposium on Empirical Software Engineering and Measurement
Cost estimation for cross-organizational ERP projects: research perspectives
Software Quality Control
Hi-index | 0.00 |
This paper presents a two-site case study on requirements-based effort estimation practices in enterprise resource planning projects. Specifically, the case study investigated the question of how to handle qualitative data and highly volatile values of project context characteristics. We counterpart this challenge and expound upon the integration of portfolio management concepts and simulation concepts into a classic effort estimation model (COCOMO II).