Maximum bounded 3-dimensional matching is MAX SNP-complete
Information Processing Letters
Scheduling independent tasks to reduce mean finishing time
Communications of the ACM
Convex quadratic and semidefinite programming relaxations in scheduling
Journal of the ACM (JACM)
Scheduling Unrelated Machines by Randomized Rounding
SIAM Journal on Discrete Mathematics
A PTAS for Minimizing Weighted Completion Time on Uniformly Related Machines
ICALP '01 Proceedings of the 28th International Colloquium on Automata, Languages and Programming,
Non-Approximability Results for Scheduling Problems with Minsum Criteria
INFORMS Journal on Computing
Approximation Schemes for Minimizing Average Weighted Completion Time with Release Dates
FOCS '99 Proceedings of the 40th Annual Symposium on Foundations of Computer Science
SIAM Journal on Computing
Designing PTASs for MIN-SUM scheduling problems
Discrete Applied Mathematics - Special issue: Efficient algorithms
Complexity of preemptive minsum scheduling on unrelated parallel machines
Journal of Algorithms
Minimizing Average Flow Time on Unrelated Machines
Approximation and Online Algorithms
Hi-index | 0.00 |
We show that minimizing the sum of completion times on unrelated machines is APX-hard if preemption of jobs is allowed. Additionally, we show that randomized rounding of a convex quadratic program gives a non-preemptive schedule for which the sum of weighted completion times is less than 1.81 times the optimal preemptive sum. This factor is 2.78 if release dates are involved. We sketch how the ratios can be reduced further.