Computation of a multi-objective production planning model with probabilistic constraints

  • Authors:
  • N. P. Sahoo;M. P. Biswal

  • Affiliations:
  • Department of Mathematics, Indian Institute of Technology, Kharagpur, India;Department of Mathematics, Indian Institute of Technology, Kharagpur, India

  • Venue:
  • International Journal of Computer Mathematics
  • Year:
  • 2009

Quantified Score

Hi-index 0.00

Visualization

Abstract

In this paper, a multi-objective production planning model has been presented for a captive plant. The model includes multi-products, multi-plants, and multi-objective with some probabilistic constraints. The probabilistic constraints have been transformed into deterministic constraints assuming the parameters as independent normal random variables. The deterministic problem has been computed with two different methods, namely weighting method and fuzzy programming method. Finally, the integral solution obtained by these two methods have been compared.