Push and pull production systems: issues and comparisons
Operations Research
Operations planning for kanbans between two adjacent workstations
CIE '96 Proceedings of the 19th international conference on Computers and industrial engineering
Design of bi-criteria Kanban system using simulated annealing technique
Computers and Industrial Engineering
Advances in Engineering Software
Application of analytic hierarchy process in just-in-time manufacturing systems: a review
International Journal of Data Analysis Techniques and Strategies
Hi-index | 0.01 |
In this research multi-stage supply chain system which is controlled by kanban system, is evaluated. In kanban system, decision making is based on determination of the number of kanbans as well as batch sizes. This paper attempts to model supply chain system with regard to costs under just-in-time (JIT) production philosophy. Since adopted model is of mixed integer non-linear programming (MINLP) type and solving it by exact algorithm such as branch and bound (B&B) takes a lot of time, a heuristic method via Memetic algorithm (MA) is presented. Some problems are solved by our proposed MA to illustrate its performance.