Simulation and production planning for manufacturing cells
Proceedings of the 30th conference on Winter simulation
Transforming a traditional manufacturing system into a just-in-time system with kanban
WSC '88 Proceedings of the 20th conference on Winter simulation
A practical bottleneck detection method
Proceedings of the 33nd conference on Winter simulation
Simulation with Arena
Proceedings of the 34th conference on Winter simulation: exploring new frontiers
Production capacity analysis of a shock absorber assembly line using simulation
WSC '04 Proceedings of the 36th conference on Winter simulation
Validation of the re-design of a manufacturing work cell using simulation
WSC '05 Proceedings of the 37th conference on Winter simulation
Measuring manufacturing throughput using takt time analysis and simulation
Proceedings of the 39th conference on Winter simulation: 40 years! The best is yet to come
Establishing man-machine ratio using simulation
Proceedings of the 39th conference on Winter simulation: 40 years! The best is yet to come
Selecting simualtion abstraction levels in simulation models of complex manufacturing systems
Proceedings of the Winter Simulation Conference
Hi-index | 0.00 |
The aim of this research is to introduce the reader to a new perspective on the framework for designing a manufacturing line project in Japanese automobile manufacturing plants. All manufacturing aspects, manual, automated and hybrid manufacturing lines are considered; however, which line should be used for the factory is always under investigation within the factory. Simulation studies that include resource utilization, line productivity and manufacturing costs help to identify the most suitable manufacturing line type within a factory. By utilizing simulation studies, designers can make reliable decisions upon suitable manufacturing lines faster than conventional methods based upon engineering experience. In order to understand the framework of manufacturing line design, a project to design a new automobile component manufacturing line was investigated in this study, and the chosen manufacturing line was also checked by the manufacturing activities in the factory.