An experimental study of an iterative simulation-optimization algorithm for production planning

  • Authors:
  • Durmus Fatih Irdem;Necip Baris Kacar;Reha Uzsoy

  • Affiliations:
  • North Carolina State University, Raleigh, NC;North Carolina State University, Raleigh, NC;North Carolina State University, Raleigh, NC

  • Venue:
  • Proceedings of the 40th Conference on Winter Simulation
  • Year:
  • 2008

Quantified Score

Hi-index 0.00

Visualization

Abstract

It is well known from queueing and simulation models that cycle times in capacitated production systems increase nonlinearly with resource utilization, which poses considerable difficulty for the conventional linear programming (LP) models used for this purpose. Hung and Leachman (1996) propose a highly intuitive iterative approach where a detailed simulation model of the production facility is used to estimate flow time parameters used in an LP model We examine the convergence of this method under different experimental conditions, and conclude that it is hard to determine precisely when the method converges.