Introduction to Simulation and SLAM II (3rd ed.)
Introduction to Simulation and SLAM II (3rd ed.)
Introduction to operations research, 4th ed.
Introduction to operations research, 4th ed.
Essentials of Project and Systems Engineering Management
Essentials of Project and Systems Engineering Management
CEPM 5: project management - critical path method (CPM) and PERT simulated with processmodel
Proceedings of the 34th conference on Winter simulation: exploring new frontiers
Project Management: A Systems Approach to Planning, Scheduling, and Controlling
Project Management: A Systems Approach to Planning, Scheduling, and Controlling
Discrete Optimization via Simulation Using COMPASS
Operations Research
Speeding up COMPASS for high-dimensional discrete optimization via simulation
Operations Research Letters
A Fuzzy Simulated Annealing approach for project time-cost tradeoff
Journal of Intelligent & Fuzzy Systems: Applications in Engineering and Technology
Hi-index | 0.00 |
A dynamic simulation-based crashing method is introduced in this research to evaluate project networks and determine the optimum crashing configuration that minimizes the average project cost due to lateness penalties and crashing costs. This dynamic approach will let the user evaluate the project network to determine a crashing strategy at the beginning of the project and also during the life of the project. By reevaluating the project network possible adjustments to the crashing strategy may be identified and implemented. The output of the method includes a distribution of the project completion time, a distribution of the project total cost, and the project cost savings.