Revenue Management Through Dynamic Cross Selling in E-Commerce Retailing
Operations Research
Queueing Systems: Theory and Applications
Manufacturing & Service Operations Management
Manufacturing & Service Operations Management
The Value of Component Commonality in a Dynamic Inventory System with Lead Times
Manufacturing & Service Operations Management
No-Holdback Allocation Rules for Continuous-Time Assemble-to-Order Systems
Operations Research
Scheduling with compressible and stochastic release dates
Computers and Operations Research
Hi-index | 0.00 |
In an assemble-to-order system, a wide variety of products are rapidly assembled from component inventories in response to customer orders. We assume that orders must be filled within a product-specific target lead time. In the event that some of the components required to fill an order are out of stock, these components must be expedited. The objective is to minimize the expected infinite-horizon discounted cost of primary component production and expediting. Our formulation captures financial holding costs but implicitly assumes that physical holding costs are negligible. The controls are (1) sequencing orders for assembly, (2) primary component production, and (3) component expediting. We prove that the multidimensional assemble-to-order control problem separates into single-item inventory control problems. In particular, under an optimal policy for assembly sequencing, the optimal production and expediting policy for each component is independent of all other components. Hence, the literature on single-item inventory management with expediting or lost sales is directly relevant to the control of assemble-to-order systems.