Principles of CASE tool integration
Principles of CASE tool integration
The case for user-centered CASE tools
Communications of the ACM
Process Integration in CASE Environments
IEEE Software
Agile Project Management With Scrum
Agile Project Management With Scrum
Monitoring Requirements Coverage using Reconstructed Views: An Industrial Case Study
WCRE '06 Proceedings of the 13th Working Conference on Reverse Engineering
Integrated solution engineering
Companion to the 21st ACM SIGPLAN symposium on Object-oriented programming systems, languages, and applications
ACM Transactions on Software Engineering and Methodology (TOSEM)
Towards software configuration management for unified models
Proceedings of the 2008 international workshop on Comparison and versioning of software models
Rationale-based Unified Software Engineering Model
Rationale-based Unified Software Engineering Model
5th international workshop on Traceability in Emerging Forms of Software Engineering (TEFSE 2009)
ICSE '09 COMPANION Proceedings of the 2009 31st International Conference on Software Engineering: Companion Volume
Traceability-Based Change Awareness
MODELS '09 Proceedings of the 12th International Conference on Model Driven Engineering Languages and Systems
Hi-index | 0.00 |
Traceability is commonly known as the ability to describe and follow links between artifacts, e.g. between requirements and their corresponding part of the system design. These links are typically inside of the system specification. Very few approaches consider traceability between the system specification and project management artifacts. By introducing links between these two models, a task can be traced to the system model elements it is related to. This paper proposes a unified model, which explicitly combines project management models and system specification models to enable traceability. We introduce and discuss the following key concepts, which are currently evaluated in a case study: (1) Ability to navigate between tasks and the according part of the specification, (2) Project management status aggregation by system specification artifacts, (3) Use of entities from the system model for project planning, (4) Unified model validation.