Effort estimation using analogy
Proceedings of the 18th international conference on Software engineering
Estimating Software Project Effort Using Analogies
IEEE Transactions on Software Engineering
Principles of data mining
Software Engineering Economics
Software Engineering Economics
A Simulation Tool for Efficient Analogy Based Cost Estimation
Empirical Software Engineering
Building A Software Cost Estimation Model Based On Categorical Data
METRICS '01 Proceedings of the 7th International Symposium on Software Metrics
Estimating the development cost of custom software
Information and Management
Data Mining: Practical Machine Learning Tools and Techniques, Second Edition (Morgan Kaufmann Series in Data Management Systems)
The adjusted analogy-based software effort estimation based on similarity distances
Journal of Systems and Software
A flexible method for software effort estimation by analogy
Empirical Software Engineering
IEEE Transactions on Software Engineering
Hi-index | 0.00 |
Analogy-based estimation is a widely adopted method in software cost estimation that identifies analogous projects to the one under estimation and uses their data to derive an estimate, i.e. it is a Case Based Reasoning approach. The similarity measures between pairs of projects are critical for identifying the most appropriate historical data from which the estimation will be generated. Usually the similarity measures are selected empirically, using jackknife-like procedures. Typically, the measures that identify the most similar projects in most of the cases are considered the most appropriate ones and are applied in every new estimation procedure. However there are situations that the default similarity measures may not be the most appropriate ones. In this study we determine the situations in which the default parameters are not the best and we propose the similarity measures for these cases. In particular we provide rules that point out which projects are not accurately estimated with the default parameters.