Integrated CE tools for postponed aerospace product and process decisions

  • Authors:
  • Cássio Dias Gonçalves;Luís Gonzaga Trabasso;Geilson Loureiro

  • Affiliations:
  • Aeronautics Brazilian Institute of Technology (ITA);Aeronautics Brazilian Institute of Technology (ITA);Integration and Testing Laboratory (LIT) Brazilian Institute for Space Research (INPE)

  • Venue:
  • Proceedings of the 2006 conference on Leading the Web in Concurrent Engineering: Next Generation Concurrent Engineering
  • Year:
  • 2006

Quantified Score

Hi-index 0.00

Visualization

Abstract

This paper aims to develop, demonstrate and justify a quantitative method that identifies the best kind and optimal level of postponement that should be adopted in an Aerospace Company to promote production cost reduction, improving customer service, offering short times of delivery and increasing the overall program profit. This method also intends to determine the best time to make the main decisions during the product development project.