Process planning and scheduling—a method of integration for productivity improvement
Computers and Industrial Engineering
A collaborative process planning and scheduling system
Advances in Engineering Software - Special issue: computer-aided process planning
Computers and Industrial Engineering
A symbiotic evolutionary algorithm for the integration of process planning and job shop scheduling
Computers and Operations Research
Evaluating the impact of alternative plans on manufacturing performance
Computers and Industrial Engineering
A simulated annealing-based optimization approach for integrated process planning and scheduling
International Journal of Computer Integrated Manufacturing
Applications of particle swarm optimisation in integrated process planning and scheduling
Robotics and Computer-Integrated Manufacturing
Integration of process planning and scheduling-A modified genetic algorithm-based approach
Computers and Operations Research
Expert Systems with Applications: An International Journal
An active learning genetic algorithm for integrated process planning and scheduling
Expert Systems with Applications: An International Journal
Hi-index | 0.01 |
Traditionally, process planning and scheduling were performed sequentially, where scheduling was implemented after process plans had been generated. Considering their complementarity, it is necessary to integrate these two functions more tightly to improve the performance of a manufacturing system greatly. In this paper, a mathematical model of integrated process planning and scheduling has been formulated. And, an evolutionary algorithm-based approach has been developed to facilitate the integration and optimization of these two functions. To improve the optimized performance of the approach, efficient genetic representation and operator schemes have been developed. To verify the feasibility and performance of the proposed approach, experimental studies have been conducted and comparisons have been made between this approach and some previous works. The experimental results show that the integrated process planning and scheduling is necessary and the proposed approach has achieved significant improvement.