An optimal production run time with imperfect production processes and allowable shortages
Computers and Operations Research
Computational aspects of an extended EMQ model with variable production rate
Computers and Operations Research - Articles presented at the conference on routing and location (CORAL)
CISST'08 Proceedings of the 2nd WSEAS International Conference on Circuits, Systems, Signal and Telecommunications
CISST'08 Proceedings of the 2nd WSEAS International Conference on Circuits, Systems, Signal and Telecommunications
WSEAS Transactions on Mathematics
WSEAS Transactions on Information Science and Applications
Computers and Operations Research
Computational aspects of an extended EMQ model with variable production rate
Computers and Operations Research - Articles presented at the conference on routing and location (CORAL)
Optimization of the finite production rate model with scrap, rework and stochastic machine breakdown
Computers & Mathematics with Applications
Integrated maintenance and control policy based on quality control
Computers and Industrial Engineering
Production systems with rework and machine failure taking place in backorder filling time
CISST'10 Proceedings of the 4th WSEAS international conference on Circuits, systems, signal and telecommunications
Production systems with backordering, rework and machine failure taking place in stock piling time
CISST'10 Proceedings of the 4th WSEAS international conference on Circuits, systems, signal and telecommunications
An EMQ model in an imperfect production process
International Journal of Systems Science
WSEAS Transactions on Information Science and Applications
WSEAS Transactions on Mathematics
Computers and Industrial Engineering
Replenishment run time problem with machine breakdown and failure in rework
Expert Systems with Applications: An International Journal
Optimal production lot sizing with rework, scrap rate, and service level constraint
Mathematical and Computer Modelling: An International Journal
Mathematical and Computer Modelling: An International Journal
Optimal lot sizing with unreliable production system
Mathematical and Computer Modelling: An International Journal
Expert Systems with Applications: An International Journal
Modelling and Simulation in Engineering
Computers and Industrial Engineering
The machine breakdown paradox: How random shifts in the production rate may increase company profits
Computers and Industrial Engineering
Hi-index | 0.01 |