A heuristic procedure for makespan minimization in job shops with multiple identical processors
ICC&IE Selected papers from the 22nd ICC&IE conference on Computers & industrial engineering
Computers and Operations Research
On Space Resource Constrained Job Scheduling Problems- A Container Loading Heuristic Approach
ICNC '08 Proceedings of the 2008 Fourth International Conference on Natural Computation - Volume 07
A Space Allocation Algorithm for Minimal Early and Tardy Costs in Space Scheduling
NISS '09 Proceedings of the 2009 International Conference on New Trends in Information and Service Science
Hi-index | 0.00 |
The factory space is one of the critical resources for the machine assembly industry. In machinery industry, space utilizations are critical to the efficiency of a schedule. The higher the utilization of a schedule is, the quicker the jobs can be done. Therefore, the main purpose of this research is to derive a method to allocate jobs into the shop floor to minimize the makespan for the machinery industry. In this research, we develop an algorithm, Longest Contact Edge Algorithm, to schedule jobs into the shop floor. We employed the algorithm to allocate space for jobs and found that the Longest Contact Edge Algorithm outperforms the Northwest Algorithm for obtaining better allocations. However, the Longest Contact Edge Algorithm results in more time complexity than that of the Northwest Algorithm.