Implicit modeling of flexible break assignments in optimal shift scheduling
Management Science
Improved implicit optimal modeling of the labor shift scheduling problem
Management Science
Optimal shift scheduling with multiple break windows
Management Science
Staff scheduling at the United States postal service
Computers and Operations Research
A hybrid LS-CP solver for the shifts and breaks design problem
HM'10 Proceedings of the 7th international conference on Hybrid metaheuristics
An improved memetic algorithm for break scheduling
HM'10 Proceedings of the 7th international conference on Hybrid metaheuristics
Grammar-Based Integer Programming Models for Multiactivity Shift Scheduling
Management Science
Assigning multiple activities to work shifts
Journal of Scheduling
Cyclic staff scheduling: optimization models for some real-life problems
Journal of Scheduling
Hi-index | 0.00 |
A new deterministic flow shop problem is studied where the objective is to minimize the total WIP (work-in-process) cost. Based on a value added model, the unit time WIP cost increases as a job passes through various stages in the production process.The ...