Location-based services to control roller compaction quality for rock-fill dams

  • Authors:
  • Hao Wu;Qiankun Wang;Jiru Zhang;Qin Chen;Xupeng Wang

  • Affiliations:
  • School of Resources and Environmental Engineering, Wuhan University of Technology, Wuhan, P. R. China;School of Civil Engineering and Architecture, Wuhan University of Technology, Wuhan, P. R. China;School of Civil Engineering and Architecture, Wuhan University of Technology, Wuhan, P. R. China;School of Civil Engineering and Architecture, Wuhan University of Technology, Wuhan, P. R. China;School of Resources and Environmental Engineering, Wuhan University of Technology, Wuhan, P. R. China

  • Venue:
  • WiCOM'09 Proceedings of the 5th International Conference on Wireless communications, networking and mobile computing
  • Year:
  • 2009

Quantified Score

Hi-index 0.00

Visualization

Abstract

It is very important for rock-fill dams to carry out more accurately monitoring and remotely quality controlling in real time. Based on location based services, an integration platform, with the name of CRCQ-DAM, is proposed to control roller compaction quality for rock-fill dam, which can meet the needs of real-time and accuracy about the roller compaction quality. An example of application research is experimented in Pubugou hydropower station, which is the largest rock-fill dam of China at present. It can be made a conclusion that CRCQDAM achieves more accurately monitoring and remotely quality controlling in real time.