Flexible timeline-based plan verification

  • Authors:
  • A. Cesta;A. Finzi;S. Fratini;A. Orlandini;E. Tronci

  • Affiliations:
  • ISTC, CNR, Rome, Italy;DSF, "Federico II" University, Naples, Italy;ISTC, CNR, Rome, Italy;DIA, "Roma TRE" University, Rome, Italy;DI, "La Sapienza" University, Rome, Italy

  • Venue:
  • KI'09 Proceedings of the 32nd annual German conference on Advances in artificial intelligence
  • Year:
  • 2009

Quantified Score

Hi-index 0.00

Visualization

Abstract

Flexible temporal planning is a general technique that has demonstrated wide applications possibilities in heterogeneous domains. A key problem for widening applicability of these techniques is the robust connection between plan generation and execution. This paper describes how a model-checking verification tool, based on UPPAAL-TIGA, is suitable for verifying flexible temporal plans. Moreover, we further investigate a particular perspective, i.e., the one of verifying dynamic controllability before actual plan execution.