Information systems development research: an exploration of ideas in practice
The Computer Journal - Special issue on methodologies (systems and software)
Software Cost Estimation with Cocomo II with Cdrom
Software Cost Estimation with Cocomo II with Cdrom
Software development method tailoring at Motorola
Communications of the ACM - Digital rights management
A Decision Support System for Software Reliability Engineering Strategy Selection
COMPSAC '99 23rd International Computer Software and Applications Conference
A Characterisation Schema for Software Testing Techniques
Empirical Software Engineering
Strategic alignment of software process improvement programs using QFD
Proceedings of the 1st international workshop on Business impact of process improvements
Scoping software process lines
Software Process: Improvement and Practice - Examining Process Design and Change
Assessing quality processes with ODC COQUALMO
ICSP'08 Proceedings of the Software process, 2008 international conference on Making globally distributed software development a success story
Improving the development of e-business systems by introducing process-based software product lines
PROFES'06 Proceedings of the 7th international conference on Product-Focused Software Process Improvement
Goal-driven evaluation of process fragments using weighted dependency graphs
Proceedings of the 2011 International Conference on Software and Systems Process
Hi-index | 0.00 |
Having software processes that fit technological, project, and business demands is one important prerequisite for software-developing organizations to operate successfully in a sustainable way. However, many such organizations suffer from processes that do not fit their demands, either because they do not provide the necessary support, or because they provide features that are no longer necessary. This leads to unnecessary costs during the development cycle, a phenomenon that worsens over time. This paper presents the SCOPE approach for systematically determining the process demands of current and future products and projects, for analyzing existing processes aimed at satisfying these demands, and for subsequently selecting those processes that provide the most benefit for the organization. The validation showed that SCOPE is capable of adjusting an organization's process scope in such a way that the most suitable processes are kept and the least suitable ones can be discarded.