An artificial bee colony with random key for resource-constrained project scheduling

  • Authors:
  • Yan-Jun Shi;Fu-Zhen Qu;Wang Chen

  • Affiliations:
  • School of Mechanical Engineering, Dalian University of Technology, Dalian, P.R. China;School of Mechanical Engineering, Dalian University of Technology, Dalian, P.R. China;China North Vehicle Research Institute Beijing, P.R. China

  • Venue:
  • LSMS/ICSEE'10 Proceedings of the 2010 international conference on Life system modeling and simulation and intelligent computing, and 2010 international conference on Intelligent computing for sustainable energy and environment: Part II
  • Year:
  • 2010

Quantified Score

Hi-index 0.00

Visualization

Abstract

This paper proposes an artificial bee colony (ABC for short) algorithm with random key for resource-constrained project scheduling (RCPSP for short) in real time. Aim at resource saving by the activities, the RCPSP problem attempts to obtain a feasible schedule minimizing the makespan. We modified the artificial bee colony algorithm (named by ABC-RK) for this problem, where the problem representation was based on random key, and a heuristic priority rule to assign activities was also employed. The preliminary experimental results showed the effectiveness of the ABC-RK algorithm.