Introduction to Simulation and Risk Analysis
Introduction to Simulation and Risk Analysis
Hi-index | 12.05 |
Two new types of hierarchy probability cost analysis (HPCA) model incorporating money allocated is money spent (MAIMS) principle based on definite work breakdown structure (WBS) level for EPC (engineering, procurement and construction) projects are presented. The proposed models have skillfully solved dilemma to appropriate cost elements and maximize the efficiency of information for cost risk analysis. Macroscopic and microscopic risk analysis of the project cost elements are introduced for meaningful model input. The illustration of an actual bidding EPC project substantiates that proposed integrating HPCA-hierarchy MAIMS models have demonstrated effective and viable for EPC projects.