Integrated Sequencing and Scheduling in Coil Coating

  • Authors:
  • Wiebke Höhn;Felix G. König;Rolf H. Möhring;Marco E. Lübbecke

  • Affiliations:
  • Institut für Mathematik, Technische Universität Berlin, 10623 Berlin, Germany;Institut für Mathematik, Technische Universität Berlin, 10623 Berlin, Germany;Institut für Mathematik, Technische Universität Berlin, 10623 Berlin, Germany;Department of Operations Research, RWTH Aachen University, 52056 Aachen, Germany

  • Venue:
  • Management Science
  • Year:
  • 2011

Quantified Score

Hi-index 0.01

Visualization

Abstract

We consider a complex planning problem in integrated steel production. A sequence of coils of sheet metal needs to be color coated in consecutive stages. Different coil geometries and changes of colors necessitate time-consuming setup work. In most coating stages one can choose between two parallel color tanks. This can either reduce the number of setups needed or enable setups concurrent with production. A production plan comprises the sequencing of coils and the scheduling of color tanks and setup work. The aim is to minimize the makespan for a given set of coils. We present an optimization model for this integrated sequencing and scheduling problem. A core component is a graph theoretical model for concurrent setup scheduling. It is instrumental for building a fast heuristic that is embedded into a genetic algorithm to solve the sequencing problem. The quality of our solutions is evaluated via an integer program based on a combinatorial relaxation, showing that our solutions are within 10% of the optimum. Our algorithm is implemented at Salzgitter Flachstahl GmbH, a major German steel producer. This has led to an average reduction in makespan by over 13% and has greatly exceeded expectations. This paper was accepted by Dimitris Bertsimas, optimization.