Discrete event simulation for shop floor control
WSC '94 Proceedings of the 26th conference on Winter simulation
Proceedings of the 30th conference on Winter simulation
Application of discrete event in production scheduling
Proceedings of the 30th conference on Winter simulation
Application of real-time simulation to assign due dates on logistic-manufacturing networks
Proceedings of the 30th conference on Winter simulation
Simulation with Arena
Supply chain planning: the role of simulation in advanced planning and scheduling
Proceedings of the 34th conference on Winter simulation: exploring new frontiers
Proceedings of the 34th conference on Winter simulation: exploring new frontiers
Dynamic scheduling II: SIMUL8-planner simulation-based planning and scheduling
Proceedings of the 35th conference on Winter simulation: driving innovation
Validating the capacity planning process and flowline product sequencing through simulation analysis
WSC '05 Proceedings of the 37th conference on Winter simulation
WSC '05 Proceedings of the 37th conference on Winter simulation
Simulation as support for production planning in small and medium enterprise: a case study
WSC '05 Proceedings of the 37th conference on Winter simulation
A distributed time-driven simulation method for enabling real-time manufacturing shop floor control
Computers and Industrial Engineering
Data models for retrieving task-specific and technicians-adaptive hypermedia
WSEAS Transactions on Computers
Reconfigurable machine tool programming: a new approach
WSEAS Transactions on Systems and Control
Hi-index | 0.00 |
The present paper faces the problem of simplifying simulation tools management in their industrial applications. An approach to implement efficiently and effectively simulation models in manufacturing systems, as decision support system, is deployed. The framework proposed is very flexible and easy to use because of the building block architecture and the automatic model generation. This model is focused on operational decisions as those concerning with scheduling problems.