Using artificial bee colony to solve stochastic resource constrained project scheduling problem

  • Authors:
  • Amin Tahooneh;Koorush Ziarati

  • Affiliations:
  • Department of Mathematics, College of Science, Science, Shiraz University, Shiraz, Iran;Department of Computer Science and Engineering, Shiraz University, Shiraz, Iran

  • Venue:
  • ICSI'11 Proceedings of the Second international conference on Advances in swarm intelligence - Volume Part I
  • Year:
  • 2011

Quantified Score

Hi-index 0.00

Visualization

Abstract

Resource constrained project scheduling (RCPSP) is one of the most crucial problems in project problem. The aim of RCPSP, which is NP-hard, is to minimize the project duration. Sometimes the activity durations are not known in advance and are random variables. These problems are called stochastic resource constrained project scheduling problems or stochastic RCPSP. Various algorithms such as genetic algorithm and GRASP have been applied on stochastic RCPSP. Bee algorithm is a metaheuristic based on the intelligent behavior of honey bee swarms. The goal of this study is adopting the artificial bee colony (ABC) algorithm to solve stochastic RCPSP and investigating its performance on the stochastic RCPSP. Simulation results show that proposed algorithm is an effective method for solving the stochastic resource constrained project scheduling problem. With regard to the problems with high distribution variability, the ABC algorithm is more effective than the other algorithms in the literature.