Ethernet powerlink asynchronous phase examination

  • Authors:
  • Václav Kaczmarczyk;Michal Šír;Zdeněk Bradáč

  • Affiliations:
  • Department of Control and Instrumentation, Brno University of Technology, Brno, Czech Republic;Department of Control and Instrumentation, Brno University of Technology, Brno, Czech Republic;Department of Control and Instrumentation, Brno University of Technology, Brno, Czech Republic

  • Venue:
  • CIT'11 Proceedings of the 5th WSEAS international conference on Communications and information technology
  • Year:
  • 2011

Quantified Score

Hi-index 0.00

Visualization

Abstract

This paper, as continuation of author's previous paper, describes Ethernet Powerlink communication protocol performance evaluation. After the slight introduction to Industrial Ethernet and Ethernet Powerlink (EPL) specifically, the simulation process is described. In the following, the paper is focused on the asynchronous communication phase. The EPL cycle asynchronous phase behavior is simulated and there are shown two typical situations that can arise. In case that such a simulation is made during network design, it can reveal incorrect behavior of the network in early project phase. Economical aspects of such solution are the main contribution of such process.