Fuzzy scheduling of job orders in a two-stage flowshop with batch-processing machines
International Journal of Approximate Reasoning
Minimizing makespan in a flow shop with two batch-processing machines using simulated annealing
Robotics and Computer-Integrated Manufacturing
Tabu search heuristic for two-machine flowshop with batch processing machines
Computers and Industrial Engineering
Mixed integer formulation to minimize makespan in a flow shop with batch processing machines
Mathematical and Computer Modelling: An International Journal
International Journal of Bio-Inspired Computation
Tabu search and lower bounds for a combined production-transportation problem
Computers and Operations Research
Hi-index | 0.00 |
This paper considers scheduling problem of flow shop with many batch processing machines and objective of maximum lateness. An effective neighborhood search algorithm (NSA) is proposed for the problem, in which a job permutation and a batch permutation are used to indicate the solution of two sub-problems, respectively. Each job permutation consists of several family-permutations for the representation of jobs from the same family. Two swaps are applied to two permutations to produce new solutions. NSA is applied to a number of instances and compared with some methods, and computational results validate the good performance of NSA.