The ANL/IBM SP Scheduling System
IPPS '95 Proceedings of the Workshop on Job Scheduling Strategies for Parallel Processing
Theory and Practice in Parallel Job Scheduling
IPPS '97 Proceedings of the Job Scheduling Strategies for Parallel Processing
Utilization and Predictability in Scheduling the IBM SP2 with Backfilling
IPPS '98 Proceedings of the 12th. International Parallel Processing Symposium on International Parallel Processing Symposium
Using inaccurate estimates accurately
JSSPP'10 Proceedings of the 15th international conference on Job scheduling strategies for parallel processing
A job scheduling approach for multi-core clusters based on virtual malleability
Euro-Par'12 Proceedings of the 18th international conference on Parallel Processing
Hi-index | 0.00 |
The well-known TOP500 list ranks the 500 most powerful high-performance computers. However, the list lacks details about the job management and scheduling on these machines. As this statistic is interesting for researchers and system designers, this paper gives an overview and survey on scheduling relevant information for the first 50 entries in the TOP500 list.