Optimal work-rest scheduling with exponential work-rate decay
Management Science
Improved Approximation Algorithms for Shop Scheduling Problems
SIAM Journal on Computing
Optimal scheduling of a flexible-duration rest period for a work group
Operations Research
Genetic Algorithms and Manufacturing Systems Design
Genetic Algorithms and Manufacturing Systems Design
Introduction to Reinforcement Learning
Introduction to Reinforcement Learning
Some propositions of information fusion for pattern recognition with context task
AI'05 Proceedings of the 18th Australian Joint conference on Advances in Artificial Intelligence
Boosted decision trees for diagnosis type of hypertension
ISBMDA'05 Proceedings of the 6th International conference on Biological and Medical Data Analysis
Hi-index | 0.00 |
In this paper we present the experimentation system with database for efficient job performing, using as an example an animal clinic. The structure of tasks and operations is based on the real procedures performed at an animal clinic. The assumed model implemented in the system is more sophisticated than a typical job-shop because of a multitude of various parameters, such as fatigue factor and the presence of uncertainty. The used heuristic priority algorithm enables us to analyze easily the impact of varied factors on the produced work-plan, and emphasize or switch off the impact of any considered factor. The system has been implemented in Matlab environment. In this work we present the opportunities of the proposed system on two examples. The first example of research is focused on choosing the optimal subset of performers for a given work. The second example concerns some work-rest policies, needed for evaluating the optimal work-rest model.