Sequencer: smart control of hardware and software components in clusters (and beyond)

  • Authors:
  • Pierre Vignéras

  • Affiliations:
  • Extreme Computing R&D Bull, Architect of an Open World

  • Venue:
  • LISA'11 Proceedings of the 25th international conference on Large Installation System Administration
  • Year:
  • 2011

Quantified Score

Hi-index 0.00

Visualization

Abstract

Starting/stopping a whole cluster or a part of it is a real challenge considering the different commands related to various device types and manufacturers, and the order that should be respected. This article presents a solution called the sequencer that allows the automatic shutting down and starting up of clusters, subset of clusters or even data-centers. It provides two operation modes designed for ease of use and emergency conditions. Our product has been designed to be efficient and it is currently used to power on and power off one of the largest cluster in the world: the Tera-100, made of more than 4000 nodes.