Scheduling groups of jobs in the two-machine flow shop

  • Authors:
  • K.R Baker

  • Affiliations:
  • The Amos Tuck School of Business Administration, Dartmouth College, Hanover, NH 03755, U.S.A.

  • Venue:
  • Mathematical and Computer Modelling: An International Journal
  • Year:
  • 1990

Quantified Score

Hi-index 0.98

Visualization

Abstract

This paper provides a review of the two-machine flow shop model when time lags or setups are introduced. Building on these results, it establishes a general framework for scheduling groups of jobs when each group requires a setup.