Production control in multistage systems with variable yield losses
Operations Research
The structure of periodic review policies in the presence of random yield
Operations Research
Multiple lot-sizing decisions with an interrupted geometric yield and variable production time
Computers and Industrial Engineering
Serial production systems with random yield and rigid demand: A heuristic
Operations Research Letters
Hi-index | 0.00 |
When yield is random and production is in lots, several successive lots may need to be attempted in order to satisfy a rigid demand. This problem is investigated using the 'stochastically proportional' yield concept which does not assume independence of units in a lot. The functional equation is shown to have explicit and highly interpretable solutions in some cases.