Application of RFID on equipment parts readiness management system of semiconductor packaging plant

  • Authors:
  • Wei-Ling Wang;Chiao-Tzu Huang;Shu-Jen Wang;Chia-Pao Chang;Hui-Wen Liao

  • Affiliations:
  • Department of Industrial Engineering and Management, National Chin-Yi University of Technology, No. 57, Sec. 2, Zhongshan Rd., Taiping Dist., Taichung City, Taiwan;Department of Industrial Engineering and Management, National Chin-Yi University of Technology, No. 57, Sec. 2, Zhongshan Rd., Taiping Dist., Taichung City, Taiwan;Department of Industrial Engineering and Management, National Chin-Yi University of Technology, No. 57, Sec. 2, Zhongshan Rd., Taiping Dist., Taichung City, Taiwan;Department of Industrial Engineering and Management, National Chin-Yi University of Technology, No. 57, Sec. 2, Zhongshan Rd., Taiping Dist., Taichung City, Taiwan;Department of Information Technology, Ling-Tung University, No. 1, Ling Tung Rd., Taichung, Taiwan

  • Venue:
  • International Journal of Information Technology and Management
  • Year:
  • 2013

Quantified Score

Hi-index 0.00

Visualization

Abstract

Management of equipment parts readiness for process setup adjustment to meet variable order requirements in a semiconductor packaging plant is crucial to the health of production lines and downtime avoidance. In order to improve the current equipment parts readiness management system, which is exercised by periodical manual verification, this paper propose a RFID-enabled equipment parts readiness management system REPR-MS to take advantage of RFID technology in real-time monitor and track the equipment parts readiness flow. To validate the design, four tests of hypotheses were developed to compare the before and after introducing REPR-MS on four different parts flow impacted areas. The hypotheses were tested using survey data originated from a semiconductor packaging plant. This paper studies against the combined pilot run data based on the equipment parts readiness management operation proposed under REPR-MS. Moreover, this paper investigates the production time saving of individual station of the assembly line in the studied plant and the affected rate of average time of each operating step of equipment parts readiness management after introducing REPR-MS. The results show significant potential and promising efficiency for performance improvement and cost saving after adopting REPR-MS.