Efficient Monte Carlo simulation method of GERT-type network for project management
Computers and Industrial Engineering - 26th International conference on computers and industrial engineering
Applying fuzzy method for measuring criticality in project network
Information Sciences: an International Journal
Genetic optimization of order scheduling with multiple uncertainties
Expert Systems with Applications: An International Journal
Finding multiple possible critical paths using fuzzy PERT
IEEE Transactions on Systems, Man, and Cybernetics, Part B: Cybernetics
On the sure criticality of tasks in activity networks withimprecise durations
IEEE Transactions on Systems, Man, and Cybernetics, Part B: Cybernetics
On the hardness of evaluating criticality of activities in a planar network with duration intervals
Operations Research Letters
Hi-index | 0.00 |
In this paper, the authors propose a new method to compute the fuzzy latest times and float times of activities for a project scheduling problem with fuzzy activity times. The authors have considered LR fuzzy numbers to represent the activity times. As the data of the problem are LR fuzzy numbers, the authors have shown that the results are also in terms of LR fuzzy numbers. Total float time of each activity can be found by this method without using the forward pass and backward pass computations. The authors use an example to illustrate the method. This paper shows the advantages of this method over the existing methods with great clarity. The proposed method illustrates its application to fuzzy critical path problems occurring in real life situations.