Using data mining to find patterns in genetic algorithm solutions to a job shop schedule
Computers and Industrial Engineering
A Hybrid SOM-BPN Approach to Lot Output Time Prediction in a Wafer Fab
Neural Processing Letters
A multi-criteria approach for scheduling semiconductor wafer fabrication facilities
Journal of Scheduling
Computers and Industrial Engineering
International Journal of Systems Science
Computers and Industrial Engineering
A PCA-FBPN Approach for Job Cycle Time Estimation in a Wafer Fabrication Factory
International Journal of Fuzzy System Applications
Hi-index | 0.00 |
Job dispatching in a wafer fabrication factory is a difficult task, mainly due to the complexity of the production system and the uncertainty involved in the production activities. Recently, a number of advanced dispatching rules were proposed, which estimate the remaining cycle times of jobs. This predictive nature is conducive to the effectiveness of these rules. If the uncertainty in the remaining cycle time can be better considered, incorrect scheduling will possibly be reduced. The tailored nonlinear fluctuation smoothing rule for mean cycle time TNFSMCT is fuzzified in this study, by expressing the remaining cycle time with a fuzzy value. The effectiveness of the proposed methodology is illustrated with a simulation study.