The Performance of Concurrency Control Algorithms for Database Management Systems
VLDB '84 Proceedings of the 10th International Conference on Very Large Data Bases
Similarity Search in High Dimensions via Hashing
VLDB '99 Proceedings of the 25th International Conference on Very Large Data Bases
StreamIt: A Language for Streaming Applications
CC '02 Proceedings of the 11th International Conference on Compiler Construction
Design and evaluation of a compiler for embedded stream programs
Proceedings of the 2008 ACM SIGPLAN-SIGBED conference on Languages, compilers, and tools for embedded systems
OLTP through the looking glass, and what we found there
Proceedings of the 2008 ACM SIGMOD international conference on Management of data
ZStream: a cost-based query processor for adaptively detecting composite events
Proceedings of the 2009 ACM SIGMOD International Conference on Management of data
ArrayStore: a storage manager for complex parallel array processing
Proceedings of the 2011 ACM SIGMOD International Conference on Management of data
SSDBM'11 Proceedings of the 23rd international conference on Scientific and statistical database management
Calvin: fast distributed transactions for partitioned database systems
SIGMOD '12 Proceedings of the 2012 ACM SIGMOD International Conference on Management of Data
Efficient Versioning for Scientific Array Databases
ICDE '12 Proceedings of the 2012 IEEE 28th International Conference on Data Engineering
A demonstration of DBWipes: clean as you query
Proceedings of the VLDB Endowment
Hi-index | 0.00 |
Intel has moved to a collaboration model with universities consisting of "Science and Technology Centers" (ISTCs). These are located at a "hub" university with participation from other universities, contain embedded Intel personnel, and are focused on some research theme. Intel held a national competition for a 5th Science and Technology center in 2012 and selected a proposal from M.I.T. with a theme of "Big Data". This paper presents the big data vision of this technology center and the execution plan for the first few years.