A survey of manufacturing flexibility: Implications for e-business flexibility
IBM Systems Journal
Minimizing the number of late jobs for the permutation flowshop problem with secondary resources
Computers and Operations Research
IEA/AIE '08 Proceedings of the 21st international conference on Industrial, Engineering and Other Applications of Applied Intelligent Systems: New Frontiers in Applied Artificial Intelligence
Computers and Operations Research
Scheduling identical parallel machines and operators within a period based changing mode
Computers and Operations Research
Parallel dedicated machine scheduling problem with sequence-dependent setups and a single server
Computers and Industrial Engineering
PATAT'06 Proceedings of the 6th international conference on Practice and theory of automated timetabling VI
Parallel machine scheduling with flexible resources
Computers and Industrial Engineering
Hi-index | 0.01 |