Simulation-base finite capacity scheduling: a case study

  • Authors:
  • Maureen T. Rosenwinkel;Paul Rogers

  • Affiliations:
  • John Crane, Inc., 6400 W. Oakton, Morton Grove, Illinois;Division of Manufacturing Engineering, Department of Mechanical Engineering, The University of Calgary, Calgary, Alberta, T2N 1N4, Canada

  • Venue:
  • WSC '93 Proceedings of the 25th conference on Winter simulation
  • Year:
  • 1993

Quantified Score

Hi-index 0.00

Visualization

Abstract