A heuristic for scheduling to minimize the sum of weighted flowtime of jobs in a flowshop with sequence-dependent setup times of jobs

  • Authors:
  • C. Rajendran;H. Ziegler

  • Affiliations:
  • -;-

  • Venue:
  • Proceedings of the 21st international conference on Computers and industrial engineering
  • Year:
  • 1997

Quantified Score

Hi-index 0.00

Visualization

Abstract