Comparison of a two-stage group-screening design to a standard 2k-p design for a whole-line semiconductor manufacturing simulation model

  • Authors:
  • Theodora Ivanova;Linda Malone;Mansooreh Mollaghasemi

  • Affiliations:
  • Lucent Technologies, 9333 S. John Young Parkway, Orlando, FL;Department of Industrial Engineering and Management Systems, University of Central Florida, Orlando, FL;Department of Industrial Engineering and Management Systems, University of Central Florida, Orlando, FL

  • Venue:
  • Proceedings of the 31st conference on Winter simulation: Simulation---a bridge to the future - Volume 1
  • Year:
  • 1999

Quantified Score

Hi-index 0.00

Visualization

Abstract