Designing the Westercheldetunnel toll plaza using a combination of queueing and simulation

  • Authors:
  • Nico M. van Dijk;Mark D. Hermans;Maurice J. G. Teunisse;Henk Schuurman

  • Affiliations:
  • Incontrol Business Engineers, Planetenbaan 21, 3606 AK Maarssen, The Netherlands;Incontrol Business Engineers, Planetenbaan 21, 3606 AK Maarssen, The Netherlands;Incontrol Business Engineers, Planetenbaan 21, 3606 AK Maarssen, The Netherlands;Ministry of Transport, Public Works and Watermanagement, Transport Research Centre (AVV), P.O. Box 1031, 3000 BA Rotterdam, The Netherlands

  • Venue:
  • Proceedings of the 31st conference on Winter simulation: Simulation---a bridge to the future - Volume 2
  • Year:
  • 1999

Quantified Score

Hi-index 0.00

Visualization

Abstract