Scheduling requests on multi-stage multi-server to increase quality of service
Network control and engineering for Qos, security and mobility II
A new approach to solve hybrid flow shop scheduling problems by artificial immune system
Future Generation Computer Systems - Special issue: Computational science of lattice Boltzmann modelling
Total completion time minimization in a computer system with a server and two parallel processors
Computers and Operations Research
Computers and Operations Research
Tsp-based scheduling in a batch-wise hybrid flow-shop
Robotics and Computer-Integrated Manufacturing
Proceedings of the 9th annual conference on Genetic and evolutionary computation
Computers and Operations Research
Modeling realistic hybrid flexible flowshop scheduling problems
Computers and Operations Research
A note on two-stage hybrid flowshop scheduling with missing operations
Computers and Industrial Engineering
A new heuristic for scheduling the two-stage flowshop with additional resources
Computers and Industrial Engineering
A performance comparison of PSO and GA in scheduling hybrid flow-shops with multiprocessor tasks
Proceedings of the 2008 ACM symposium on Applied computing
Computers and Operations Research
Optimal cash flow and operational planning in a company supply chain
International Journal of Computer Integrated Manufacturing - Industrial Engineering and Systems Management
A tabu search heuristic for the hybrid flowshop scheduling with finite intermediate buffers
Computers and Operations Research
Scheduling algorithms to minimize the number of tardy jobs in two-stage hybrid flow shops
Computers and Industrial Engineering
Computers and Operations Research
Computers and Operations Research
Computers and Industrial Engineering
Computers and Industrial Engineering
Expert Systems with Applications: An International Journal
Algorithms for a realistic variant of flowshop scheduling
Computers and Operations Research
Integrating simulation and optimization to schedule a hybrid flow shop with maintenance constraints
Computers and Industrial Engineering
Minimum deviation algorithm for two-stageno-wait flowshops with parallel machines
Computers & Mathematics with Applications
Computers and Operations Research
Application of EM algorithm to hybrid flow shop scheduling problems with a special blocking
ETFA'09 Proceedings of the 14th IEEE international conference on Emerging technologies & factory automation
Operating theatre scheduling with patient recovery in both operating rooms and recovery beds
Computers and Industrial Engineering
Performance of particle swarm optimization in scheduling hybrid flow-shops with multiprocessor tasks
ICCSA'07 Proceedings of the 2007 international conference on Computational science and its applications - Volume Part III
An efficient heuristic for adaptive production scheduling and control in one-of-a-kind production
Computers and Operations Research
Computers and Industrial Engineering
Expert Systems with Applications: An International Journal
Metaheuristic methods in hybrid flow shop scheduling problem
Expert Systems with Applications: An International Journal
Bi-objective scheduling for reentrant hybrid flow shop using Pareto genetic algorithm
Computers and Industrial Engineering
Computers and Industrial Engineering
Ant colony optimization algorithm for a Bi-criteria 2-stage hybrid flowshop scheduling problem
Journal of Intelligent Manufacturing
IUKM'11 Proceedings of the 2011 international conference on Integrated uncertainty in knowledge modelling and decision making
A heuristic method for two-stage hybrid flow shop with dedicated machines
Computers and Operations Research
A two-stage hybrid flowshop scheduling problem in machine breakdown condition
Journal of Intelligent Manufacturing
A genetic algorithm for two-stage no-wait hybrid flow shop scheduling problem
Computers and Operations Research
An Ant Colony System Algorithm for the Hybrid Flow-Shop Scheduling Problem
International Journal of Applied Metaheuristic Computing
Two-stage proportionate flexible flow shop to minimize the makespan
Journal of Combinatorial Optimization
Computers and Operations Research
Computers and Industrial Engineering
Computers and Operations Research
A cutting and scheduling problem in float glass manufacturing
Journal of Scheduling
A new three-machine shop scheduling: complexity and approximation algorithm
Journal of Combinatorial Optimization
Hi-index | 0.01 |