Operator work load: when is enough enough?

  • Authors:
  • Moira LeMay;Eric Hird

  • Affiliations:
  • Montclair State College, Upper Montclair, NJ;California Institute of Technology, Pasadena

  • Venue:
  • Communications of the ACM
  • Year:
  • 1986

Quantified Score

Hi-index 48.22

Visualization

Abstract

Three measures of operator mental work load were tested with a large, interactive computer system. Two—operator rating of time stress, and the ratio of the time required to time allowed for each subtask—proved to be significant and easy to use.