The software engineering laboratory: an operational software experience factory
ICSE '92 Proceedings of the 14th international conference on Software engineering
IEEE Software
Requirements engineering
Managing risk: methods for software systems development
Managing risk: methods for software systems development
Experiences in improving risk management processes using the concepts of the Riskit method
SIGSOFT '98/FSE-6 Proceedings of the 6th ACM SIGSOFT international symposium on Foundations of software engineering
Handbook of Walkthroughs, Inspections, and Technical Reviews: Evaluating Programs, Projects, and Products
A Knowledge Management Lifecycle for Experience Packages on Software Engineering Technologies
SEKE '99 Proceedings of the 11th International Conference on Software Engineering and Knowledge Engineering, Learning Software Organizations, Methodology and Applications
Active Probes Synergy in Experience-Based Process Improvement
PROFES '00 Proceedings of the Second International Conference on Product Focused Software Process Improvement
LIDs: A Light-Weight Approach to Experience Elicitation and Reuse
PROFES '00 Proceedings of the Second International Conference on Product Focused Software Process Improvement
Leveraging feedback on processes in SOA projects
EuroSPI'06 Proceedings of the 13th European conference on Software Process Improvement
Hi-index | 0.00 |
Software process improvement is often defined and framed by general maturity models such as CMM or SPICE. Those models are applicable over a wide range of companies and contexts. However, specific experiences can make important contributions of a different kind to process improvement. It may not be obvious, though, how experience-based elements can be effectively integrated into software process improvement activities. At DaimlerChrysler, we have applied experience-based concepts to software process improvement for a number of years. During that time, we learned many lessons about experience-based PI approaches that were more or less successful. In this paper, a number of areas are described in which experiences can be highly advantageous to use. The exploitation of experiences is deeply ingrained into PI activities and goes beyond experience package writing and publishing in a database or a web-tool. Risk management is used as process improvement example from practice.