A BSP Approach to the Scheduling of Tightly-Nested Loops

  • Authors:
  • Radu Calinescu

  • Affiliations:
  • -

  • Venue:
  • IPPS '97 Proceedings of the 11th International Symposium on Parallel Processing
  • Year:
  • 1997

Quantified Score

Hi-index 0.00

Visualization

Abstract

This paper addresses the scheduling of uniform-dependence loop nests within the framework of the bulk-synchronous parallel (BSP) model. Two broad classes of tightly-nested loops are identified in the paper and scheduled according to the BSP discipline, and the resulting schedules are analysed in terms of the BSP cost model.