Optimal Scheduling for UET-UCT Generalized n-Dimensional Grid Task Graphs

  • Authors:
  • Theodore Andronikos;Nectarios Koziris;George K. Papakonstantinou;Panayotis Tsanakas

  • Affiliations:
  • -;-;-;-

  • Venue:
  • IPPS '97 Proceedings of the 11th International Symposium on Parallel Processing
  • Year:
  • 1997

Quantified Score

Hi-index 0.00

Visualization

Abstract

The n-dimensional grid is one of the most representative patterns of data flow in parallel computation. The most frequently used scheduling models for grids is the unit execution - unit communication time (UET-UCT). In this paper we enhance the model of n-dimensional grid by adding extra diagonal edges. First, we calculate the optimal makespan for the generalized UET-UCT grid topology and, then, we establish the minimum number of processors required, to achieve the optimal makespan. Furthermore, we solve the scheduling problem for generalized n-dimensional grids by proposing an optimal time and space scheduling strategy. We thus prove that UET-UCT scheduling of generalized n-dimensional grids is low complexity tractable.