Cost Estimation of Software Projects through Case Base Reasoning
ICCBR '95 Proceedings of the First International Conference on Case-Based Reasoning Research and Development
Estimating Software Development Effort with Case-Based Reasoning
ICCBR '97 Proceedings of the Second International Conference on Case-Based Reasoning Research and Development
A distributed case-based reasoning application for engineering sales support
IJCAI'99 Proceedings of the 16th international joint conference on Artifical intelligence - Volume 1
Self-adaptive Agent-Based Dynamic Scheduling for a Semiconductor Manufacturing Factory
SAB '08 Proceedings of the 10th international conference on Simulation of Adaptive Behavior: From Animals to Animats
Incorporating future release plan in predicting wafer lot output time with a hybrid ANN
ROCOM'06 Proceedings of the 6th WSEAS international conference on Robotics, control and manufacturing technology
A hybrid SOM-FBPN approach for output time prediction in a wafer fab
ROCOM'06 Proceedings of the 6th WSEAS international conference on Robotics, control and manufacturing technology
A systematic procedure for evaluating the achievability of an output time forecast in a wafer fab
ICS'06 Proceedings of the 10th WSEAS international conference on Systems
ICONIP'06 Proceedings of the 13th international conference on Neural information processing - Volume Part III
A look-ahead fuzzy back propagation network for lot output time series prediction in a wafer fab
ICONIP'06 Proceedings of the 13th international conference on Neural information processing - Volume Part III
A novel CBR system for numeric prediction
Information Sciences: an International Journal
MICAI'06 Proceedings of the 5th Mexican international conference on Artificial Intelligence
RSCTC'06 Proceedings of the 5th international conference on Rough Sets and Current Trends in Computing
A PCA-FBPN Approach for Job Cycle Time Estimation in a Wafer Fabrication Factory
International Journal of Fuzzy System Applications
Computers and Industrial Engineering
Hi-index | 0.00 |
This study explores a new application of Case-Based Reasoning (CBR) in the due-date assignment problem of the wafer fabrication factory. Owing to the complexity of the wafer fabrication, the manufacturing processes of the wafer are very complicated and time-consuming. Thus, the due-date assignment of each order presents a challenging problem to the production planning and scheduling people. Since the product of each order is closely related to the products manufactured before, the CBR approach provides a good tool for us to apply it to the due-date assignment problem. The CBR system could potentially replace the human decision in the estimation of the due-date. Therefore, a CBR system is developed in this study using the similarity coefficient of each order with previous orders. The experimental results show that the proposed approach is very effective and comparable with a neural network approach.