Batching and scheduling in a multi-machine flow shop
Journal of Scheduling
Minimizing makespan in a flow shop with two batch-processing machines using simulated annealing
Robotics and Computer-Integrated Manufacturing
Three is easy, two is hard: open shop sum-batch scheduling problem refined
Operations Research Letters
Two-Agent scheduling on an unbounded serial batching machine
ISCO'12 Proceedings of the Second international conference on Combinatorial Optimization
Hi-index | 0.00 |
In this paper, we study a problem of scheduling and batching on two machines in a flow-shop and open-shop environment. Each machine processes operations in batches, and the processing time of a batch is the sum of the processing times of the operations in that batch. A setup time, which depends only on the machine, is required before a batch is processed on a machine, and all jobs in a batch remain at the machine until the entire batch is processed. The aim is to make batching and sequencing decisions, which specify a partition of the jobs into batches on each machine, and a processing order of the batches on each machine, respectively, so that the makespan is minimized. The flow-shop problem is shown to be strongly NP-hard. We demonstrate that there is an optimal solution with the same batches on the two machines; we refer to these asconsistent batches. A heuristic is developed that selects the best schedule among several with one, two, or three consistent batches, and is shown to have a worst-case performance ratio of 4/3. For the open-shop, we show that the problem is NP-hard in the ordinary sense. By proving the existence of an optimal solution with one, two or three consistent batches, a close relationship is established with the problem of scheduling two or three identical parallel machines to minimize the makespan. This allows a pseudo-polynomial algorithm to be derived, and various heuristic methods to be suggested.