A computerized production scheduling system

  • Authors:
  • Robert G. Sargent

  • Affiliations:
  • -

  • Venue:
  • WSC '81 Proceedings of the 13th conference on Winter simulation - Volume 2
  • Year:
  • 1981

Quantified Score

Hi-index 0.00

Visualization

Abstract

A computerized production scheduling system is described that was developed to replace a manual system for scheduling production in a production subsystem consisting of one hundred seventy people and a considerable amount of expensive production equipment. This computerized system uses a deterministic simulator for scheduling production and requires large data bases.