Simulation of a network manufacturing process

  • Authors:
  • Wayne J. Oates;Susan H. Antle

  • Affiliations:
  • -;-

  • Venue:
  • WSC '81 Proceedings of the 13th conference on Winter simulation - Volume 2
  • Year:
  • 1981

Quantified Score

Hi-index 0.00

Visualization

Abstract

A GPSS model was developed to simulate the flow of parts through the stages of a network manufacturing process. The general network consists of M sequential stages, with a variable number of machines per stage. Parts can be processed on any of the Ni machines at stage i, and different types of parts may be mixed within a single machine. The simulator is used to evaluate scheduling policies proposed for each stage of the process. Scheduling policies to be considered are first in-first out (FIFO), last in-first out (LIFO), minimum process time, maximum process time, random, and priority.